There is a setting called a loss rate within the item master record that can be used to determine a loss percentage for the item. Ex without setup the item: Demand de qtde 10 para 10-jan-2019 Supply de qtde 10 para 10-jan-2019 With setup Item to 0.5 = 50% loss. Demand of quantity 10 para... Continuar Lendo →
Working with MRP / ASCP Demand Time Fence
Sales order and manual demands are considered, and forecasting demands may or may not be produced, so the planner can decide whether, it depends the configurations that are put into the item setup. Ex: I have demands from two sources. Sales Orders and Forecast TESTE_FABRICAR -> Ordem de Venda -> 15-JAN-2019 TESTE_FABRICAR -> Previsão ->... Continuar Lendo →
Working with MRP / ASCP Planning Time Fence
In this post I will sho how we can control our production plan with some settings within the item setup. If our plan has demand entry at sales orders or manual demand. This demand is the demand date is 11-11-2018, however for manufacture the item it takes 150 days (calendar of the inventory organization). No... Continuar Lendo →
Charge x Capacity with Resource Efficiency Restriction
In this post I will show one of the functionalities with MRP and ASCP. Inside a shop floor we have several processes going on at the same time, and from a planning point of view, one of the main problems is charge and capacity control. Within the various configurations that are required, it is possible... Continuar Lendo →
Comparison of ASCP Plan Exceptions
In this article I will demonstrate functionality that assists in research and decision making about changes in the production plane. One of the big problems companies have with regard to planning is whether their production plan X capacity are aligned with the productive reality. Today, to know if your production plan is coherent, one of... Continuar Lendo →
Setup of shifts to resources disponibility
This post I will show the setup that needs to be done for the advanced planning module to distribute the load resource. Oracle has a number of specific and very useful features for resource capability analysis, and one of them is to assign different tasks to a resource depending on the capability of the resource... Continuar Lendo →
Change Itens ASCP attributes
In this post I will show one of the features of ASCP that can be useful when maintaining the items that are part of one or more plans. Advance Supply Chain Planning -> Setup -> Item Attributes Mass Maintenance The list of items that the system brings is only one or more plans that are... Continuar Lendo →
Create Exceptions Sets
In this post I will shw how to create an exception set, and assign it to an item and simulate two examples. The Oracle Planning Module there are exceptions for you to control your production plan, but it allows you to make exceptions records as you need them. Shortage Exceptions After did this registration you... Continuar Lendo →